Reviews and Restrictions

All property owners must obtain advance approval of any property improvements, additions, renovations or installations. This includes but is not limited to fences, decks, mini-barns, porches, sidewalks, driveways -- even changing the color of your house.

Written requests should be submitted the Review and Restriction Committee 30 days before construction begins to afford committee review and written approval. Written approval from the committee is required to avoid any potential corrective action that could result in additional costs or materials or affect your project’s scheduled completion.

Here’s what’s required, per the Association's Declaration of Restrictions (6Ai):
1)   A complete set of plans and specifications for the proposed construction or improvement.
2)   Such plans shall include a plot plan showing the location of existing improvements and the location of the proposed improvement to be constructed or placed upon the lot, each properly and clearly designated.
3)    Such plans and specifications shall set forth the color and composition of all exterior materials proposed to be used and any proposed landscaping.
4)    All plans and drawings shall be drawn to a scale of 1" = 10', or to such other scale as the Committee may require.
5)    Property building permits and relevant reports also are required.
6)  All such plot plans shall be prepared by either a registered land surveyor, engineer or architect.

Questions may be directed to Board President/Review and Restrictions Chairman Scott Thien at (317) 902-3103 or scottthien@comcast.net

Comments

Popular posts from this blog

Board Update: Curb Appeal Award winners, inaugural Card Night on Oct. 10, live music Oct. 21 at Clubhouse!

Board Update, 05-22-23: Pool opening, tags in mail; annual Garage Sale; dues deadline June 1; Annual Meeting and Board Election June 15

Board update: Pool closing Labor Day, annual dog swim, Curb Appeal Awards, live music coming to Clubhouse!